Attendees: Ron Lemieux, Holly VanDeursen, Bill Noyes, Scott Prochazka
Others: Andrea Wilhelm & Gabby Ceballos (CPG), (CDC) Garret Eller, Mary & Shannon (CDC)
The meeting was called to order @ 1:04 PM and with all board members present, a quorum was established.
Civil Design Consultants CIP Review, Flow Meter Project Update, & Plumbing Audit RFP Discussion
The Board met with Civil Design Consultants to review V10 of the updated Water Capital Improvement Plan, flow meter updates, and the plumbing audit RFP. A key focus was a proposed buried concrete storage tank to increase water capacity for emergency use and fire protection. The tank would need to match the existing system’s elevation and depth, or would require additional balancing equipment, with estimated costs ranging from $5 to $7 per gallon depending on scope. Based on prior feedback from the Fire Chief, current water capacity would only protect a limited portion of Dakota Ridge during a fire, and an expansion may increase that modestly. The Board agreed that increasing water capacity should be a priority if significant capital funds are invested and approximately $10K was approved for engineering scoping to evaluate feasibility, location options, and alternative configurations.
The plumbing audit RFP was reviewed, with bids ranging from $750 to $877 per home. Due to concerns regarding aging service lines and potential that the current scope could cause additional leaks with draining/re-pressurization, alternatives were discussed. The Board agreed to place the residential audit on hold and prioritize completion of the meter pit system to see if the new data could isolate residential audits to a subsection of homes vs. the entire neighborhood, therefore reducing costs. Additional infrastructure improvements for 2026 include the final meter pit installation from the 2025 scope estimated at $30-$45K and a fire hydrant and gate valve replacement at the top of Trail Ridge Rd. for $25K and $7.5K, respectively. Holly motioned to approve the hydrant replacement, seconded by Ron, and all approved unanimously. Garrett stated that Native was hoping to mobilize on both in the next two weeks.
The Board also reviewed a DIPRA pipeline condition assessment, noting prior testing in 2021 showed low corrosion risk and that funding is already included in the capital plan. No immediate action was required.
PFAS monitoring requirements were discussed, including the need for two samples prior to April 2027 and potential treatment by 2029 if thresholds are exceeded. Testing is scheduled twice this year, with no decisions required until results are available.
Additional discussion included groundwater classification, which would only change if system sources were modified, and a recommendation to complete a sustained yield test to confirm system capacity. Other potential projects, including pipeline looping and fire flow improvements, were discussed but identified as lower priority in the “Potential Future Needs” category of the Water CIP at this time. Civil Design Consultants exited the meeting and Andrea noted she would get back to them with any additional changes to the CIP which later included only the addition of only $10K in water tank scoping costs.
Year End Financial Review and 2026/2027 Budget
Holly provided an advance written summary of variances of $2000 or more versus budget. Andrea noted that Net Income is expected to be just above $30K due to $20K in Snow Removal savings and another $10K in Interest Income. The only unrecorded expense remains the final 2025/2026 income tax liability calculation which will move from a prepaid account on the balance sheet. Capital Reserves are expected to be at roughly $420K at year end if the Board includes the Net Income surplus in that balance as an additional reserve contribution.
Next, Andrea noted that she and Holly had a previous meeting to review/finalize the proposed 2026–2027 Operating Budget, which reflects an approximate $10K increase in both revenue and expense with the notable changes being related to architectural fee income and administration.
Water User Fee revenue was increased by $6K based on the three-year average and ultimately dues will remain the same as the prior year at $2265 Operating and $3380 Reserve. Following discussion, the Board approved the 2026–2027 budget and agreed to roll the 3/31/26 Net Income surplus into Reserves. The motion was made by Holly, seconded by Ron, and approved unanimously. Andrea asked if the Board wanted to invoice annual dues in April with the Q1 water charges or wait until after the Annual Meeting. All members present voted to proceed with billing them since the amounts are unchanged over the prior year.
Roads
Andrea reported that RMA is scheduled to complete both the crack filling and seal coating sometime in April. She was also able to get the price reduced by $15K from $235K to $220K.
Formal Adoption of Revised Collection Policy
The Board formally approved the revised Collection Policy distributed to owners for a 30-day period of comment on 2/3/26. The motion was made by Ron, seconded by Holly, and approved unanimously.
ARC Updates
The Board approved moving forward with Peggy Martin as the ARC Administrator at a $75/hour billing rate to oversee administrative aspects of construction and design review processes. Updated procedures, including revised checklists and guideline updates, will be implemented. Fee structures were updated to include a non-refundable $7.5K administrative fee and a refundable $30K construction deposit. Updated processes and fee schedules will be distributed to the owners once Andrea has them reviewed by our outside legal counsel and the Board approves. The ARC has also asked ESA Architect Thomas Davis to prepare the first draft of our revised Design Guidelines. That draft will be reviewed by the ARC and the Board and then sent to all Homeowners for review and comment before scheduling a vote for final approval. It is the ARC and Board’s desire to have this process completed and a vote before the end of this Calendar year.
May 11th Annual Meeting Planning & Next Board Meeting Date
The Board discussed initial planning for the May 11th Annual Meeting, including the meeting packet, committee reports, and owner reminders. Andrea noted she would try to have a draft packet to the Board by 4/20 and ready to circulate to owners two weeks prior to the meeting on 4/27. To date, no other owner has expressed interest in filling Scott’s or Ron’s seats.
The next Board meeting was scheduled for July 14th at 10:30 AM, with July 13th at 9:30 AM identified as a back-up option.
The meeting adjourned at 2:32 PM.
Recorded by,
Commercial Property Group