The meeting was called to order at 8:35 AM.
Board Members Present: Holly Van Deursen, Ron Lemieux, Scott Prochazka, Carrie Hayden, and Bill Noyes
Others Present: Andrea Wilhelm and Selena Wathern, Commercial Property Group
With all Members of the Board present, a quorum was established.
Approval of Prior Meeting Minutes
Holly Van Deursen motioned to approve the February 4, 2025 Board meeting minutes as presented. Ron Lemieux seconded the motion and all were in favor.
Association Finance
2024/2025 Fiscal Year End: The negative variance in Operating Income is driven by less Water User Fees billed than the prior year. Admin Expenses are expected to end the year slightly unfavorable to budget for the road engineer’s Consulting Fees. DRB Expenses are under budget as a result of less than anticipated DRB Architect Fees. HOA Repairs and Maintenance are expected to end the year slightly over budget with Andrea noting that Snow Removal expenses for the month of March were an anomaly and are driving the favorable variance but Road Maintenance is the main driver of the unfavorable overall variance because of the increased cost of annual crack filling. Water System Expenses will end the year favorable to budget due to favorable variances in both Water Contractor and Water System Repairs expenses. Overall, the Net Operating Income for the 2024/2025 fiscal year is anticipated to be approximately $4,000 unfavorable to budget, driven by the decrease in Water User Fees. Interest earnings for the year were just over $12K, helping to offset the overall Net Income variance. Capital expenditures include Water System Improvements for alterations and replacements of fire hydrants and waterline valves, Road Improvements to seal coat Trail Ridge Road, the installation of the cluster mailbox enclosure, a sinkhole repair in the south meadow, and roadside wildfire mitigation. The year-end Balance Sheet reflects approximately $500,000 in Assets with all bank accounts containing under the FDIC deposit insurance limit and approximately $418,000 in the Capital Reserve fund noting the current Association procedures require a minimum fund balance of $300,000.
2025/2026 Operating Budget: Operating Dues are balanced with expenses less the additional budgeted revenue of Water User Fees and DRB Fee Income. The Water User Fees Budget decreased to the approximate 3-year average. Admin Expenses increased on account of the contracted annual HOA Management Fee increase, an assumed 10% increase in HOA Insurance based on current market trends, and the addition of budgeted Consulting Fees to update the Roadway Evaluation report. No changes were made to the DRB Expense Budget in anticipation of a Design Guideline review performed by the DRB Architect. HOA Repairs and Maintenance increased by $10K, largely driven by the increased Road Maintenance Budget based on the estimate received for annual crack filling. The Board unanimously agreed to continue contracting Mosquito Control with the Association’s vendor. Nominal changes were made to Water System expenses to account for the contracted inflationary increase for Water Storage Contract. Discussion occurred regarding the Water System Repairs Budget with the Board unanimously approving the budgeted amount to remain static from the prior year at $25K to ensure enough funds are budgeted in the event of additional water leaks. In total, the budgeted Operating Expenses increased by approximately $15,000 driven largely by the increased Road Maintenance Budget and the offsetting income of Water User Fees in Operating Income decreased resulting in an increase in Operating Dues. The 2025 annual Operating Dues will be $2,265 per lot, which is an increase of $347 per lot over the prior year.
2025/2026 Capital Reserve Budget: The Capital Reserve Dues will remain the same as the prior fiscal year at $3380 per lot. Budgeted expenses for the fiscal year include $219,000 to install 8 new meters along the main line to aid in identifying and reducing water loss, $5,000 to repair a dip on Aspen Ridge Road, and $25,000 for the 5-year cycle of wildfire mitigation of the largest common parcel located on the north side of the neighborhood.
The water system infrastructure engineering firm provided an email update ahead of the meeting on their progress on the following items. The Water CIP revisions are in progress along with the RPF for meters #1-#4, expected to be put to bid in May. An estimate for the vault construction and installation of meters #5-#8 is forthcoming along with their redline revisions to the Design Guidelines relating to water system specifications. While final cost estimates have not been received, the 2025 Budget for the installation of the 8 main line meters is based on the preliminary conservative project estimates as provided by the engineering firm. Discussion occurred regarding the updated CIP, the timeliness of the engineering firm and Board expectations, and confirmation that both the Operating and Capital Reserve Budgets contain funds for an audit of residential service lines and further leak testing as needed.
In consultation with Routt County Road and Bridge, Bill Noyes determined that the County performs a full depth reclamation of asphalt roads on a 21-year cycle, with chip sealing occurring at years 7 and 14, and crack filling completed as needed. The Association’s road engineer communicated that, while Dakota Ridge roads will see less traffic than county roads, the snow removal operations in the neighborhood have a greater negative impact as the plows will erode the road system over time and recommended maintaining a 5–7-year maintenance cycle for chip sealing. The engineer also stated that both seal coating and chip sealing are surface protection measures with neither adding subbase to the road over time to prolong the future need for full depth reclamation. He noted that chip sealing is advantageous as it adds traction to the roads, and regardless of seal coat or chip seal, the roads should be crack filled annually to prevent water penetration. The engineer ultimately noted that, with both applications achieving equal long-term results, the determination of which to use is up to personal preference. The Board reviewed two Capital Reserve models, one forecasting the chip seal application on a 6-year cycle and the other forecasting the seal coating application on a 3-year cycle, with neither model indicating a significant financial impact over the other. Discussion occurred regarding the owner survey results, the road system is currently in good condition, and added traction is not necessary for all the roads in the neighborhood. The Board directed management to engage the current road engineer to provide an updated report on the remaining life span of the road system to include core sampling for a broader understanding of future needs. After thorough investigation of the difference in cost and approach to the project, the Board reached the conclusion that, based on available information, there is minimal difference in cost between the two applications and most owners expressed a preference to maintain seal coating.
Bill Noyes motioned to continue the current seal coating application on a 3-year cycle. Holly Van Deursen seconded the motion and all were in favor. The Board will continue to gather data on both applications and will adjust the road maintenance approach should it be warranted.
Discussion occurred regarding the $300,000 minimum Capital Reserve fund balance established around 2018 with Andrea noting that, based on experience managing other HOAs with similar infrastructure, the threshold should likely now be closer to $500,000. The Board will further review the minimum fund threshold to determine the cost basis of the minimum threshold and make recommendations for increasing as necessary.
Ron Lemieux motioned to approve the 2025 Budget as presented and discussed. Scott Prochazka seconded the motion and all were in favor.
Water Loss Update
Water loss has increased to 15 gallons per minute, up from 12 gpm in the prior quarter, and is driving the need to complete the mainline meter installation project. The Board directed management to strongly relay their concerns to the engineering firm and the water operator, requesting they immediately begin coordinating the residential service line audit to determine if there is unmetered water usage or signs of a leak at or near each residence before the start of irrigation season. The owners and contractors of homes currently under construction were previously contacted to confirm they had not tied into the water line and that there were no visible signs of a leak on the job site, with each confirming neither had occurred.
Annual Meeting
The Annual Meeting will be held on May 7, 2025 at 4:00 PM via Zoom. The draft meeting packet will be provided to the Board the week of April 14th and will be distributed to the ownership the week of April 23rd. The seats held by Carrie Hayden and Bill Noyes are up for election and both are willing and interested in serving again.
ARC Update
Andrea advised the Board of a recently surfaced issue whereas a residence constructed in the early 1990’s was built entirely outside of the building envelope. The owner was directed to consult with the County regarding a building envelope variance before submitting a variance request to the Association. Discussion occurred regarding potential compliance controls that could be incorporated into the process, the forthcoming Architectural Guidelines review, and the desire for adequate community representation on the Board appointed review Committee.
Next Board Meeting
The next Board of Directors meeting is tentatively scheduled for July 10, 2025 at 8:30 AM via Zoom.
The meeting adjourned at 10:12 AM.